Click for St. Louis, Missouri Forecast

// a href = ./ // St Louis News, Weather, Sports, The Big 550 AM, St Louis Traffic, Breaking News in St Louis

Online pharmacy:fesmag.com/tem

Have you a sex problem? Please visit our site:fesmag.com/medic

Site map
 
 
 

All of the street, bridge and interstate improvements planned for downtown St. Louis are on track to be finished on time.  That was the message from Missouri and Illinois transportation engineers when they briefed the East-West Gateway Council of Governments Wednesday.  

   High water on the Mississippi River has caused some delays for crews building the new River Bridge, but project officials say the work continues and they still expect to finish by early next year.  

   Some of the other projects planned for downtown St. Louis over the next two years include the park that will cap the I-70 depressed lanes, new ramps connecting I-70 and I-55 to the Poplar Street Bridge and a year-long resurfacing project on the MLK bridge.

Published in Around Town

All of the street, bridge and interstate improvements planned for downtown St. Louis are on track to be finished on time.  That was the message from Missouri and Illinois transportation engineers when they briefed the East-West Gateway Council of Governments Wednesday.  

   High water on the Mississippi River has caused some delays for crews building the new River Bridge, but project officials say the work continues and they still expect to finish by early next year.  

   Some of the other projects planned for downtown St. Louis over the next two years include the park that will cap the I-70 depressed lanes, new ramps connecting I-70 and I-55 to the Poplar Street Bridge and a year-long resurfacing project on the MLK bridge.

Published in Local News
Thursday, 21 February 2013 08:30

Phase 2 of Arch grounds re-do finds funding

The next phase of the planned improvements to the Arch grounds is set to get underway this summer.

Crews had already planned to begin construction of the "lid" over I-70.

Now, the rebuild of Leonor K. Sullivan Boulevard, which runs along the riverfront at the base of the Arch steps, will also start this year. The road will be elevated and redesigned to include bike paths and pedestrian walkways.

Funding had already been in place for the $47 million park that will cap the highway. Newly found savings from that project will help fund the other.

The St. Louis Post-Dispatch reports that engineers have determined that the concrete walls of the "depressed section" of I-70 don’t need to be replaced, as originally thought. So the $11-million cost savings on that project will fund the Leonor K. Sullivan rebuild.
Published in Around Town
Thursday, 21 February 2013 04:34

Phase 2 of Arch grounds re-do finds funding

The next phase of the planned improvements to the Arch grounds is set to get underway this summer.

Crews had already planned to begin construction of the "lid" over I-70.

Now, the rebuild of Leonor K. Sullivan Boulevard, which runs along the riverfront at the base of the Arch steps, will also start this year. The road will be elevated and redesigned to include bike paths and pedestrian walkways.

Funding had already been in place for the $47 million park that will cap the highway. Newly found savings from that project will help fund the other.

The St. Louis Post-Dispatch reports that engineers have determined that the concrete walls of the "depressed section" of I-70 don’t need to be replaced, as originally thought. So the $11-million cost savings on that project will fund the Leonor K. Sullivan rebuild.
Published in Local News
Page 2 of 2

Latest News

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
Prev Next

Ferry stops service on Mississippi River

  MEYER, Ill. (AP) — A farm cooperative has shut down a ferry service that shuttled agricultural products and other goods across the Mississippi River between western I...

Pepsi franchise to open center in Cape Girardeau

Pepsi franchise to open center in Cape Girardeau

  CAPE GIRARDEAU, Mo. (AP) — A Pepsi franchise is planning to build a new customer service center in Cape Girardeau (juh-RAHR'-doh) that could create 74 jobs. The M...

Man charged in Kansas City-area highway shootings

  KANSAS CITY, Mo. (AP) — Authorities say a Kansas City-area man has been charged with 18 felony counts in connection with about a dozen recent random highway shootings...

Molina's error hurts Cardinals in 3-1 loss to Nats

  WASHINGTON (AP) -- There's a simple reason St. Louis Cardinals pitcher Michael Wacha felt comfortable putting a changeup in the ground with the bases loaded in the se...

St. Louis priest accused of having sex with minor

St. Louis priest accused of having sex with minor

St. Louis, MO (KTRS) - A St. Louis priest is accused of having sex with a minor at the Cathedral Basilica, where he served.   Reverend Joseph Jiang was arrested on ...

Missouri man in custody after clerical error frees him from prison

Missouri man in custody after clerical error frees him …

ST. LOUIS (AP) - A Missouri man who avoided prison because of a clerical error and led a law-abiding life for 13 years said he is overwhelmed by the support he's received since ...

Hazelwood voters could vote on new utility tax

Hazelwood voters could vote on new utility tax

St. Louis, MO (KTRS) - Hazelwood residents could soon have the chance to vote on a proposed utility tax.   Currently, Hazelwood is the only St. Louis County municip...

Courts moving away from eyewitness testimony as gold standard

Courts moving away from eyewitness testimony as gold st…

PORTLAND, Ore. (AP) - Courts and legislatures are slowly shifting away from using eyewitness testimony as the gold standard of evidence. The reason: Studies show it's only right...

© 2013 KTRS All Rights Reserved